We needed more time to look at all viable options and after spending a couple of hours with the DEH rangers we needed to head back before dark to avoid decimating the large hopping mice population that were most prevalent on on the tracks in the area.Greg Watters wrote:Can we look at our track positioning, maybe move everything to the east a few hundred meters or wherever gives us a dry line , ?? that 3 mile slush from memory does not extend far beyond the track most times ??
Good work guys the more we know the easier it will be to get it happening
The big picture needs to be considered when the amount of area required for the turn outs and return roads etc.