Working Bee

Go here for general DLRA News

Moderator: DLRA

Post Reply
DLRA
Site Admin
Posts: 1594
Joined: Thu Feb 27, 2003 11:03 am
Location: Australia
Contact:

Working Bee

Post by DLRA »

Another Working Bee will be held from Sat 27th Dec 2003 to Jan 1st or 2nd 2004, to finish off a few loose ends.
The gearbox is still out of the Dodge truck (had clutch repaired).
Some electrical and plumbing work needs to be completed.
Privacy panels need to be erected outside the abolition block doors.
Air cleaner and exhaust improvements need to be done to the Dorman generator set.
We are going to take motorcycles / quad cycles to find a good place for our own entry onto the lake and if we do push a track through.

Please contact Rob Carroll or Rod Hadfield
Keep the shiney side up........
DLRA WebMaster / Editor
jbrough

Post by jbrough »

Most of these tasks have been completed. The camp is looking very good. Still some electrical work to do connecting the containers with hard wired power. Couldn't find the nozzle for the fire pump after much seraching. Shelves have been put in the cool room. Toilets and showers functional, only waiting for the bore water pump to be plumbed, to allow quicker filing of the toilets under heavy use. Truck is rolling, shearing shed is looking great for the auction, meeting, and bullshit sessions.
A very hot week, day temps were around 41 or 42, midnight temps around 32, and it seemed so pleasant after the days.
Post Reply